Yesterday and today were days of incredible progress. Thanks to the men of BAC Local 3 the domes are well on their way. We even started the 3rd and final layer today, which will be the visible side of the shell. The level of skill and professionalism these men show is amazing, and their dedication to building the bowls is a real testament to them.
The Bowls at the beginning of the day Thursday
No comments:
Post a Comment